Assessment Brief: PRJ5105 Project Integration and Change Management
Assessment 3: Project Management Plan for Integration, Change and Configuration Management
Group/individual: | Individual |
Word count/Time provided: | 3,000 words report (excluding references) and power point file |
Weighting: | 40% (30% Report and 10% Presentation) |
Unit Learning Outcomes: | ULO-1, ULO-2, ULO-3, ULO-4 ULO-5 |
Assessment 3 Detail
This task will give students an opportunity to practice the subject topics in a real project environment and demonstrate their competencies in using integration management methods. This assessment requires students to analyse a real-life project (either ongoing or completed) to develop and write the Integration management plan, change management and configuration management plan tailored to the selected real-life project real-life project. Student can select project in their field of interest, but project must be aligned with the discipline of project management. This assessment also requires student present their plan using a presentation file (max. 10 mins with no restriction on word count or number of slides in the PowerPoint file). For this purpose, student will need to create Power point presentation slides and use them during “live” delivery.
Connect with our online professionals for desired solutions.